HS2 Colne Valley Western Slopes
1,455
Published 2024-05-28
Significant mounds of chalk material from the tunnelling operations still remain for landscaping the southern side of the rail alignment-not sure if any has been done so far..
All Comments (3)
-
Excellent footage as ever, QM. Yeah, that's a huge amount of chalk piled up to the south possibly in readiness to landscape the construction site when it is decommissioned. I don't suppose the tunnel segment factory will be there for much longer. It's a small detail but I'm impressed with what they've achieved with the Tilehouse Lane realignment. They could have just laid a strip of tarmac through what was, basically, an open field. With the banking each side, a brand new road already has the appearance of having been there for decades if not centuries. Keep 'em coming đź‘Ť
-
Extraordinary lots of mystery mounds! Will they be wooded?