HV GIS Termination Installation

77,703
0
Published 2018-07-02

All Comments (14)
  • @kennyg1358
    Ten times more engineering and work than I would have guessed.
  • @moondog7862
    Shocking cable preparation, crossed screenwriters, scored the conductor with a knife too😂😂
  • @zizizizi1709
    110кV? What type is that termination? connex5? connex6s?
  • @douro20
    I'm guessing that the heating step is to ensure that the core is completely dry before installing the termination.
  • @hkvlog4143
    Im a asistent cable jointer and have a experience of six years on 132kv, 220kv,400kv. i worked in qatar for six years. If you need asistent cable jointer then i would be much happy to work with you
  • @Jim1Guo
    Looks like dry type plug-in termination
  • @aqibbajwa2003
    Hi guys way not use cable streping machine to save time